The next bump-in-the-road for #renewableenergy may be the (projected) shortage of high voltage cabling that will be needed to expand the #electricity inter-connecter network round #Europe.
While the EU (but now less so the UK under the #Tories) has ambitious #greenenergy targets, the infrastructure demands currently look to exceed the manufacturing capacity of these vital cables.
The Q. is will (like the chip shortage) be a temporary glitch or a longer term brake on the #GreenTransition?